Kitchen renovations replace or rework a kitchen’s layout, cabinetry, benchtops, appliances, plumbing and electrical, with a licensed builder managing the trades from design to handover. Published Australian prices for kitchen renovations run from about $10,000 for a basic update to $120,000 for a high-end kitchen, and the licence rules differ by state.
This page is for homeowners planning kitchen renovations in NSW, Victoria or Queensland. You will see what a kitchen renovation includes, what it costs, how the process runs, and which licence and contract checks to make before you pay a deposit.
Kitchen renovations are projects that update or rebuild a kitchen’s layout, cabinetry, benchtops, appliances, splashback, flooring, lighting, plumbing and electrical. A like-for-like refresh keeps the layout. A full renovation moves services, walls or both. KK Global Constructions Group manages the design, approvals, trades and handover as one fixed-price project.
A typical scope covers demolition, plumbing and electrical rough-in, cabinetry, benchtops, tiling, appliances, painting and final fit-off. Flooring and ceilings often extend into adjoining rooms, so scope the edges before you price. Homeowners who want more than one room done can ask about bathroom and kitchen renovations together on our services page.
Published Australian prices for kitchen renovations run from about $10,000 for a basic update to $120,000 for a high-end kitchen. Mid-range kitchens commonly fall between $25,000 and $50,000. Layout changes, benchtop material and appliance choices move the price most.
| Source | Published figure | Type |
| Your Property Guide | Budget $15,000 to $25,000; mid-range $25,000 to $50,000; high-end $50,000 to $120,000 | Cost guide, 2026 |
| Sydney kitchen company (Houzz) | Basic refresh from $10,000; full renovation $15,000 to $40,000+ | Company-published |
| Refresh Renovations, Sydney | $20,000 to $70,000 | Company-published |
| Refresh Renovations FAQ | Basic from $10,000; mid-range from $35,000 | Company-published |
The sources overlap but do not agree, because scope and finish level differ. Treat them as guides.
KK Global Constructions Group runs kitchen renovations through six steps: consultation, design and planning, contract and approvals, construction, quality control, and completion and handover. The contract is fixed-price. The process page shows each stage.
1. Consultation: goals, budget discussion, site inspection and an early check of what can stay.
2. Design and planning: layout and cabinetry plan, material and finish selection, and any approvals.
3. Contract and approvals: transparent quotation, fixed-price contract, approval management, insurance and compliance.
4. Construction: demolition, services, cabinetry install, benchtops, tiling and fit-off, with regular progress updates.
5. Quality control: inspections, material checks, compliance verification and issue resolution.
6. Completion and handover: final inspection, client walkthrough, handover documentation and aftercare support.
Building work above a state threshold needs a licensed builder: $5,000 in NSW, $10,000 or more in Victoria and over $3,300 in Queensland. Plumbing and electrical work needs a licensed tradesperson at any value in NSW and Queensland. Insurance and deposit rules also differ by state.
Queensland’s regulator lists the rules on its licence page, and Consumer Affairs Victoria covers payments in its paying for building work checklist.
Search the company’s licence number on your state regulator’s register before you sign. In NSW, that is the NSW Fair Trading licence check. Confirm the licence is current, covers your type of work, and matches the name on the contract.
Kitchen renovations are small enough that people skip these checks. They protect the same money as a larger build.
Many like-for-like kitchen renovations do not need council approval, but structural changes, extensions, and some plumbing or gas work do. Rules vary by council and state. Ask your builder or a certifier to confirm in writing before work starts.
Removing a load-bearing wall to open the kitchen to a living area is the usual trigger. So is adding a window or door on an external wall. KK Global manages approvals and documentation in its contract and approvals step.
Australia banned engineered stone benchtops, panels and slabs from 1 July 2024, so new kitchens use natural stone, porcelain, laminate or other surfaces. Homes built or renovated before 1990 are also likely to contain asbestos. Both issues affect scope and price before demolition starts.
The ban covers manufacture, supply, processing and installation. It does not force you to remove an existing benchtop, but removal, repair or modification must be controlled and the work regulator notified. Safe Work Australia and a SafeWork NSW fact sheet explain the steps. For asbestos, NSW allows up to 10 square metres of non-friable material to be removed with precautions, and any friable asbestos or more than 10 square metres needs a licensed removalist. The NSW asbestos site lists the rules. Asbestos can sit behind tiles and under flooring in kitchens.
Layout changes drive kitchen renovation price more than any other factor, because moving sinks, cooktops and walls means new plumbing, electrical and making good. Cabinetry type, benchtop material and appliances follow. Use the worksheet below to settle each item before quotes.
| Cost area | Settle before quoting | Your allowance |
| Layout and structure | Sink or cooktop moved, walls removed, openings | $ ______ |
| Cabinetry | Custom, flat pack or refaced; hardware | $ ______ |
| Benchtops and splashback | Natural stone, porcelain, laminate; edge profile | $ ______ |
| Appliances | Supplied by you or provisional allowance | $ ______ |
| Plumbing and electrical | New circuits, lighting, taps, gas | $ ______ |
| Flooring and painting | Floor type, area, repaint scope | $ ______ |
| Asbestos and hidden defects | Test results and a written contingency | $ ______ |
| Design and approvals | Designer fees, certifier or council fees | $ ______ |
Companies advertise about six to eight weeks from booking to completion for a standard kitchen, with on-site work taking a shorter part of that. Timelines depend on design time, approvals, cabinetry lead times and how much plumbing or structure changes. Ask for a written stage schedule before you sign.
Late changes and delayed deliveries cause most overruns. Settle your layout, benchtop and appliances before ordering starts.
Search for kitchen renovations near me, then verify each company yourself: check the licence number, the finished projects and the service area before you book a consultation. A company that lists suburbs but no licence number has not told you what matters.
KK Global Constructions Group operates from Condell Park, NSW, and takes enquiries Monday to Saturday, 7:00am to 5:00pm.
Yes. Costs, licences and insurance differ by city and state. One report notes that Sydney and Melbourne stone fabricators charge 15% to 20% more per metre than Brisbane or Adelaide, and the licence rules in the table above change at each state border. A search for kitchen renovations Melbourne, kitchen renovations Brisbane or kitchen renovations Newcastle therefore points to three different regulators. Check the rules before you compare quotes.
Victoria regulates builders separately: registration applies at $10,000 or more, domestic building insurance above $16,000, and the deposit cannot exceed 5% on contracts of $20,000 or more. Camberwell and Malvern are Melbourne suburbs, so a search for kitchen renovations Camberwell returns Victorian rules. Malvern kitchen renovations in older homes need an asbestos check before pricing.
Queensland requires a QBCC licence for building work valued over $3,300, and licensed individuals for plumbing and electrical work at any value. Home warranty insurance runs through the Queensland Home Warranty Scheme.
Newcastle follows NSW rules: a licence above $5,000, Home Building Compensation cover above $20,000 and a 10% deposit cap. Newcastle City Council notes that buildings constructed before 1990 may contain asbestos, so see its asbestos guidance.
At handover you should receive compliance certificates for the plumbing and electrical work, appliance warranties and manuals, and your builder’s handover documentation. Keep them with your house records, because a future buyer or insurer may ask for them. Certificate names and rules vary by state.
KK Global Constructions Group includes a final inspection, a client walkthrough, handover documentation and aftercare support in its last step. In NSW, statutory warranties then run six years for major defects and two years for other defects from completion. Photograph any defect, keep your emails and report problems early. NSW Fair Trading runs a free complaint handling service if a dispute starts.
Combining bathroom and kitchen renovations suits homes where both rooms need new plumbing, electrical and tiling, because one project shares design time, approvals and site setup. It suits you less if budget is tight or if you cannot live without a kitchen or bathroom for the combined period.
Pros
Cons
See our home renovation designed around the way you live guide for scoping across rooms.
A builder-managed kitchen renovation is not for owners who want only the cheapest quote, who plan a cosmetic swap of doors and handles, or who want to supply and install everything themselves. A cabinet refacer or a flat-pack installer may suit those jobs better. A builder also does not replace legal, tax or financial advice.
If you are renovating to sell, speak to a licensed agent first. Our real estate services page explains what a construction group can and cannot do in a sale.
Request a free consultation, then move through the six-step process. KK Global Constructions Group operates from Condell Park, NSW, and takes enquiries Monday to Saturday, 7:00am to 5:00pm, on 0478 820 160 or 0458 888 899.
Meet the team on the about us page, see the wider KK Global group, or book a free consultation to discuss your kitchen. For full rebuilds, see our custom home builders.
Published prices run from about $10,000 for a basic update to $120,000 for a high-end kitchen. One cost guide puts mid-range work at $25,000 to $50,000. Layout changes, benchtop material and appliances move the price most.
Yes. Plumbing and electrical work needs a licensed tradesperson at any value in NSW and Queensland. Your builder should engage licensed trades and give you the compliance paperwork at handover.
Yes. Australia banned new engineered stone benchtops, panels and slabs from 1 July 2024, but it does not require removal of benchtops already installed. Removing, repairing or modifying one needs controlled work and regulator notification.
NSW law caps the deposit at 10% of the contract price. Victoria caps it at 5% on contracts of $20,000 or more. On NSW jobs above $20,000, ask for the Home Building Compensation certificate before you pay anything.
Rarely. Once demolition, plumbing and electrical work start, the kitchen is out of use until installation finishes. Ask for a stage schedule, and plan a temporary cooking setup and meals out in your budget.
Not always. Some quotes list appliances as a provisional allowance, and others exclude them. Ask for a written list of inclusions and exclusions, and compare quotes on the same appliance and finish level.